Raw materialPrepared product with confirmed dimensions, input temperature and surface condition
Finished productFrozen product at the agreed core-temperature and handling condition
Indicative outputConfigured against the freezing time and the product temperature at discharge, not against the tunnel capacity alone.
Operator requirementsLabour is concentrated at the packing and the storage dispatch, with the tunnel running continuously.
Factory and utilitiesPlan the room for the compressor and the plant space, and confirm the floor loading and the access route for the insulated housing.
Confirm before quoteProduct size, loading, input temperature, target core temperature, freezing time, output, refrigeration and factory conditions
Acceptance basis
Define the result before final configuration.
Agree product load, input temperature, target core temperature, sampling position, test duration and production measurement method.
Planning information
Facts to settle before a line quotation.
Raw material and finished product
State the product as it arrives at the tunnel and its temperature, because a tunnel is a rate rather than a temperature. Give the product size and shape and the hourly throughput, since a thin cut and a whole piece take different times at the same belt speed. Say whether the product goes straight from a fryer or from a holding step, and whether any glaze is applied before freezing.
Capacity and operating schedule
State the hourly input and the frozen output, and the target time from entering the tunnel to emerging frozen, because the two together fix the belt speed and the tunnel length. State the working hours and the campaign pattern, and whether the line is used for one product or several, since a changeover costs both time and capacity.
Utilities and layout
The tunnel needs refrigerant capacity, power and a way to discharge the cold, and the layout follows from where that cold goes. Confirm the electrical supply and the plant room space against the compressor size, and the floor loading and the access route for the insulated housing. Plan the infeed and the discharge conveyors in line with the belt.
Scope and acceptance
List the reception, the holding step where it applies, the freezing tunnel, the cooling and the packing, with the control package, the spare parts, the installation support and the training. The refrigerant type, the plant room requirements and the product temperature measurement belong in the written scope on this line.
Project boundary: Final model, output, dimensions, utilities, food-contact material scope, price, delivery and service boundary require technical and commercial confirmation before quotation.
Equipment configuration
Related equipment pages
These links move from one machine to the full process requirement for the project.
What is included in a quick freezing conveyor line?
The line combines pre-treatment, drainage or pre-cooling, controlled feeding, a mesh-belt quick freezer, frozen discharge and a packing or cold-storage connection, sized for the agreed core temperature and handling condition.
Does an indicative -42 deg C air temperature guarantee the freezing result?
No. An indicative minimum air temperature of -42 deg C requires engineering confirmation and does not guarantee product core temperature or freezing time, which depend on product load, thickness and input temperature.
What is needed for a quick freezing line quotation?
Provide product size, loading, input temperature, target core temperature, freezing time, output, refrigeration requirements and factory conditions, including defrosting, drainage and local technical service.
Technical review
Confirm product, output, utilities and factory layout.