Potato chips
Slicing → rinsing or treatment → water removal → frying → deoiling / cooling → seasoning → packing. Confirm slice thickness, texture and bag format.
Potato processing
Connect potato preparation, cutting, frying and packing around the finished product you want to sell. Choose a potato chips, prepared fries or frozen fries route before finalizing the machine list.
Watch line videoHENAN WEITUO supplies equipment selection and line coordination with long-term manufacturing partners. The configuration below shows how the modules fit together; it is not a single fixed specification for every potato product.
Discuss configuration
| Stage | Equipment | Purpose | Scope / option |
|---|---|---|---|
| Washing & peeling | Washer, peeler and inspection conveyor | Remove soil and inspect incoming potatoes | Selected by soil load and peeling target |
| Cutting | Strip cutter or slicer | Set the fry section or chip thickness | Different cutting units for different products |
| Rinsing & treatment | Rinsing, blanching and water-removal modules | Prepare cut product for the next process | Treatment route follows product trials |
| Frying | Continuous fryer and oil-management modules | Match frying time, loading and heating | Filtration and heat source confirmed separately |
| Finishing | Deoiling, cooling and optional seasoning | Prepare the product for its packing route | Seasoning is product-dependent, not universal |
| Freezing & packing | Quick freezer and matched packing equipment | Connect to the selected finished-product route | Freezing for frozen fries; cold store scope separate |
Reference configuration only. The approved equipment list identifies included machines, options, materials and service scope.
Slicing → rinsing or treatment → water removal → frying → deoiling / cooling → seasoning → packing. Confirm slice thickness, texture and bag format.
Strip cutting and treatment are matched to the intended storage, cooking and delivery method. Do not assume this route includes IQF freezing or the same frying step as a frozen product.
Strip cutting → agreed treatment → water removal → par-frying → deoiling / cooling → quick freezing → frozen packing. Refrigeration, cold storage and cold-chain interfaces need separate planning.
View selected equipment and the line layout. The footage is a configuration reference; the final process, equipment list and acceptance conditions are agreed for your project.
Potato variety, size, solids or sugar data where available; finished dimensions; raw-input or finished-output basis and working hours.
Confirm voltage, phase, frequency, available electrical load, heating fuel, water supply, drainage and exhaust. Utility figures follow the selected machine list.
Send floor dimensions, clear height, door access and upstream / downstream heights. Frozen fries additionally need freezer, cold-store and frozen-dispatch interfaces.
The public material here consists of equipment configuration references. Use current, project-specific test and inspection records to approve the final equipment; no customer result is claimed from catalog images.
Confirm the equipment list, test material, measurement basis and acceptance method in writing.
Agree current machine photos, relevant test results, nameplate checks, packing and accessory records for the actual order.
Some preparation modules may be shared, but cutting, treatment, frying, seasoning and freezing differ. Confirm the main product, changeover method and cleaning requirements first.
Not automatically. Quick freezing belongs to the frozen-fries route. Its capacity, refrigeration package, packing interface and any cold store must be listed in the written scope.
Define the product, dimensions, raw material condition and measurement basis. The agreed trial and downstream capacity, including freezing or packing where applicable, determine the confirmed output.
Send the target product, desired output, product size, country, heat source and available floor plan. If output is not yet known, describe the intended business and packing format.
Tell us what you want to process and the equipment you are considering. Output can be discussed if it is not yet known.
Final model, output, utilities, price, delivery and after-sales responsibilities are confirmed in the written project scope.